Xinos Construction CORP
Respondent of record · docketed under 4 spellings
The city writes this respondent as Xinos Construction CORP · Xinos Construction Corporation · Xinos Construction CORP. · Xinos Construction — all folded into this one docket.
What drives the score
- +12
Defaulted hearings, unpaid — 4
Each default parks the maximum judgment on the owner's property record until it's vacated or paid.
- +8
Corrections never certified — 4
A summons without an accepted certificate of correction blocks the owner's DOB sign-offs and Certificate of Occupancy.
- +15
Job sites carrying open money — 12
Every site with an open balance is another owner in the blast radius.
- +10
Summonses in the last 12 months — 30
A live docket means the pattern is current, not history.
Scored 0–100 from the docket itself — defaults left on owners' property records, unpaid balances against the DOB's $25,000 permit-block line, corrections never certified, how many sites carry open money, and whether the docket is still live. The facts are the city's; the weighting is ours and shown above.
2 defaults are still inside the 75-day reopen window — a new hearing can be requested before the judgment hardens.
Job sites on the docket
- 1150 5 Avenue, Manhattan6 summonses · $XX,XXX due
- 1371 Linden Boulevard, Brooklyn4 summonses · $X,XXX due
- 26-79 30 Street, Queens6 summonses · $X,XXX due
- 29 Moore Street, Brooklyn2 summonses · $X,XXX due
- 360 West 22 Street, Manhattan1 summons · $X,XXX due
- 138-70 Elder Avenue, Queens2 summonses · $X,XXX due
- 150 West 225 Street, Bronx2 summonses · $X,XXX due
- 206 East 52 Street, Manhattan2 summonses · $X,XXX due
+ 157 more sites
Upcoming hearings
- Jul 30, 2026summons 039554579XMiscellaneous violations
- Aug 11, 2026summons 039554922YTemporary construction equipment installation on site expired permit
- Aug 13, 2026summons 039555084ZTemp construction equip installation on site expired permit shed
- Sep 8, 2026summons 039555934XPedestrain protection does not meet code specifications
- Sep 8, 2026summons 039555933YWork does not conform to approved construction documents amendments
Missing a hearing means the maximum penalty by default — and the clock to undo it runs 75 days.