NYC hearing docket

Wing Jay Construction INC

Respondent of record · docketed under 3 spellings

The city writes this respondent as Wing Jay Construction INC · Wing Jay Construction · Wing Jay Construction INC. — all folded into this one docket.

HIGH riskOver the DOB $25K permit-block threshold
Contractor reputation score61
CleanSevere

What drives the score

  • +9

    Defaulted hearings, unpaid — 3

    Each default parks the maximum judgment on the owner's property record until it's vacated or paid.

  • +25

    Outstanding penalties

    Unpaid balances accrue interest — and $25,000+ outstanding can freeze new DOB permits on the lots this company works.

  • +2

    Corrections never certified — 1

    A summons without an accepted certificate of correction blocks the owner's DOB sign-offs and Certificate of Occupancy.

  • +15

    Job sites carrying open money — 9

    Every site with an open balance is another owner in the blast radius.

  • +10

    Summonses in the last 12 months — 41

    A live docket means the pattern is current, not history.

Scored 0–100 from the docket itself — defaults left on owners' property records, unpaid balances against the DOB's $25,000 permit-block line, corrections never certified, how many sites carry open money, and whether the docket is still live. The facts are the city's; the weighting is ours and shown above.

95
summonses on record
$XX,XXX
outstanding balance
3
unpaid defaults
Jul 21, 2026
next hearing

3 defaults are still inside the 75-day reopen window — a new hearing can be requested before the judgment hardens.

Job sites on the docket

  • 16 Woodbine Street, Brooklyn8 summonses · $XX,XXX due
  • 67-75 Dartmouth Street, Queens8 summonses · $XX,XXX due
  • 132-51 41 Road, Queens19 summonses · $X,XXX due
  • 58-36 76 Street, Queens3 summonses · $X,XXX due
  • 257 Bainbridge Street, Brooklyn5 summonses · $X,XXX due
  • 259 Rutland Road, Brooklyn2 summonses · $X,XXX due
  • 267 Bainbridge Street, Brooklyn4 summonses · $X,XXX due
  • 269 Bainbridge Street, Brooklyn2 summonses · $X,XXX due

+ 15 more sites

Upcoming hearings

  • Jul 21, 2026summons 039553968PMiscellaneous violations
  • Jul 21, 2026summons 039188745PWork does not conform to approved construction documents amendments
  • Jul 28, 2026summons 039550692JFailure to maintain adequate housekeeping per section requirements
  • Jul 28, 2026summons 039550693LTemporary construction equipment installation on site expired permit
  • Jul 28, 2026summons 039550694NSign panel not provided or not incompliance with section

Missing a hearing means the maximum penalty by default — and the clock to undo it runs 75 days.