NYC hearing docket
Tls Construction Group I
Respondent of record · docketed under 2 spellings
The city writes this respondent as Tls Construction Group I · Tls Construction Group — all folded into this one docket.
What drives the score
- +30
Defaulted hearings, unpaid — 16
Each default parks the maximum judgment on the owner's property record until it's vacated or paid.
- +25
Outstanding penalties
Unpaid balances accrue interest — and $25,000+ outstanding can freeze new DOB permits on the lots this company works.
- +20
Corrections never certified — 10
A summons without an accepted certificate of correction blocks the owner's DOB sign-offs and Certificate of Occupancy.
- +15
Job sites carrying open money — 11
Every site with an open balance is another owner in the blast radius.
- +10
Summonses in the last 12 months — 27
A live docket means the pattern is current, not history.
Scored 0–100 from the docket itself — defaults left on owners' property records, unpaid balances against the DOB's $25,000 permit-block line, corrections never certified, how many sites carry open money, and whether the docket is still live. The facts are the city's; the weighting is ours and shown above.
5 defaults are still inside the 75-day reopen window — a new hearing can be requested before the judgment hardens.
Job sites on the docket
- 1775 West 5 Street, Brooklyn4 summonses · $XX,XXX due
- 2555 West 16 Street, Brooklyn8 summonses · $XX,XXX due
- 47-06 Parsons Boulevard, Queens3 summonses · $XX,XXX due
- 420 52 Street, Brooklyn6 summonses · $XX,XXX due
- 736 41 Street, Brooklyn5 summonses · $XX,XXX due
- 108-38 68 Road, Queens4 summonses · $XX,XXX due
- 178-03 80 Drive, Queens1 summons · $X,XXX due
- 47-10 159 Street, Queens1 summons · $X,XXX due
+ 17 more sites
Upcoming hearings
- Aug 24, 2026summons 039538208RMiscellaneous violation of the electrical code technical standards
- Sep 8, 2026summons 039194609LWork does not conform to approved const. Documents and or approved ame
- Oct 2, 2026summons 039541513KFailure to institute maintain safety equipment etc.,- no guard rails
- Oct 16, 2026summons 039544514XFailure to designate and or have construction superintendent present
- Oct 16, 2026summons 039544513YFailed to protect adj. Property
Missing a hearing means the maximum penalty by default — and the clock to undo it runs 75 days.