NYC hearing docket
Mdg Design Constr LLC
Respondent of record · docketed under 5 spellings
The city writes this respondent as Mdg Design Constr LLC · Mdg Design Constr LLC · Mdg Design Constr. LLC · Mdg Design Constr INC · Mdg Design Constr.LLC — all folded into this one docket.
What drives the score
- +6
Defaulted hearings, unpaid — 2
Each default parks the maximum judgment on the owner's property record until it's vacated or paid.
- +25
Outstanding penalties
Unpaid balances accrue interest — and $25,000+ outstanding can freeze new DOB permits on the lots this company works.
- +2
Corrections never certified — 1
A summons without an accepted certificate of correction blocks the owner's DOB sign-offs and Certificate of Occupancy.
- +12
Job sites carrying open money — 4
Every site with an open balance is another owner in the blast radius.
- +9
Summonses in the last 12 months — 9
A live docket means the pattern is current, not history.
Scored 0–100 from the docket itself — defaults left on owners' property records, unpaid balances against the DOB's $25,000 permit-block line, corrections never certified, how many sites carry open money, and whether the docket is still live. The facts are the city's; the weighting is ours and shown above.
1 default is still inside the 75-day reopen window — a new hearing can be requested before the judgment hardens.
Job sites on the docket
- 1570 East 102 Street, Brooklyn2 summonses · $XX,XXX due
- 640 Riverside Drive, Manhattan5 summonses · $XX,XXX due
- 9910 Seaview Avenue, Brooklyn2 summonses · $X,XXX due
- 753 Classon Avenue, Brooklyn9 summonses · $X,XXX due
- 123 West 112 Street, Manhattan8 summonses
- 685 Nostrand Avenue, Brooklyn4 summonses
- 114 Stagg Street, Brooklyn4 summonses
- 215 Scholes Street, Brooklyn3 summonses
+ 20 more sites
Upcoming hearings
- Aug 5, 2026summons 039554739XFailed to timely notify dept. Of an incident-fatality injury
- Aug 5, 2026summons 039554668HFailed to communicate required info to workers
- Oct 5, 2026summons 039544272MFail to comply w commissioner order to file cert of correction w DOB
- Jan 4, 2027summons 039551198ZFail to notify DOB of accident incident damage to adjoining property
Missing a hearing means the maximum penalty by default — and the clock to undo it runs 75 days.