NYC hearing docket

Jia Wei Construction INC

Respondent of record · docketed under 2 spellings

The city writes this respondent as Jia Wei Construction INC · Jia Wei Construction INC. — all folded into this one docket.

SEVERE riskOver the DOB $25K permit-block threshold
Contractor reputation score78
CleanSevere

What drives the score

  • +18

    Defaulted hearings, unpaid — 6

    Each default parks the maximum judgment on the owner's property record until it's vacated or paid.

  • +25

    Outstanding penalties

    Unpaid balances accrue interest — and $25,000+ outstanding can freeze new DOB permits on the lots this company works.

  • +10

    Corrections never certified — 5

    A summons without an accepted certificate of correction blocks the owner's DOB sign-offs and Certificate of Occupancy.

  • +15

    Job sites carrying open money — 5

    Every site with an open balance is another owner in the blast radius.

  • +10

    Summonses in the last 12 months — 22

    A live docket means the pattern is current, not history.

Scored 0–100 from the docket itself — defaults left on owners' property records, unpaid balances against the DOB's $25,000 permit-block line, corrections never certified, how many sites carry open money, and whether the docket is still live. The facts are the city's; the weighting is ours and shown above.

54
summonses on record
$XXX,XXX
outstanding balance
6
unpaid defaults
Aug 11, 2026
next hearing

1 default is still inside the 75-day reopen window — a new hearing can be requested before the judgment hardens.

Job sites on the docket

  • 35-18 Leavitt Street, Queens21 summonses · $XX,XXX due
  • 35-57 158 Street, Queens2 summonses · $XX,XXX due
  • 221 Bradford Street, Brooklyn3 summonses · $XX,XXX due
  • 145-35 Rockaway Boulevard, Queens2 summonses · $X,XXX due
  • 35-18 Garage Leavitt Street, Queens1 summons · $X,XXX due
  • 35-20 Leavitt Street, Queens6 summonses
  • 234 Mott Street, Manhattan2 summonses
  • 63-86 Wetherole Street, Queens17 summonses

Upcoming hearings

  • Aug 11, 2026summons 039554953RFail to notify DOB of accident incident damage to adjoining property
  • Aug 11, 2026summons 039554952PMiscellaneous violations
  • Aug 18, 2026summons 039555296KUnlawfully continued work while on notice of a stop work order
  • Aug 18, 2026summons 039555298YFailure to maintain display on site documents required by bc CHAPTER33
  • Aug 18, 2026summons 039555297MWork does not conform to approved construction documents amendments

Missing a hearing means the maximum penalty by default — and the clock to undo it runs 75 days.

Is this your company's docket?

DailyDog watches it daily — every hearing across every site, the default and reopen clocks, your balance against the DOB's permit-block threshold, and the OATH paperwork prefilled. Company watches are set up by our team and priced for your caseload.