NYC hearing docket
Jia Wei Construction INC
Respondent of record · docketed under 2 spellings
The city writes this respondent as Jia Wei Construction INC · Jia Wei Construction INC. — all folded into this one docket.
What drives the score
- +18
Defaulted hearings, unpaid — 6
Each default parks the maximum judgment on the owner's property record until it's vacated or paid.
- +25
Outstanding penalties
Unpaid balances accrue interest — and $25,000+ outstanding can freeze new DOB permits on the lots this company works.
- +10
Corrections never certified — 5
A summons without an accepted certificate of correction blocks the owner's DOB sign-offs and Certificate of Occupancy.
- +15
Job sites carrying open money — 5
Every site with an open balance is another owner in the blast radius.
- +10
Summonses in the last 12 months — 22
A live docket means the pattern is current, not history.
Scored 0–100 from the docket itself — defaults left on owners' property records, unpaid balances against the DOB's $25,000 permit-block line, corrections never certified, how many sites carry open money, and whether the docket is still live. The facts are the city's; the weighting is ours and shown above.
1 default is still inside the 75-day reopen window — a new hearing can be requested before the judgment hardens.
Job sites on the docket
- 35-18 Leavitt Street, Queens21 summonses · $XX,XXX due
- 35-57 158 Street, Queens2 summonses · $XX,XXX due
- 221 Bradford Street, Brooklyn3 summonses · $XX,XXX due
- 145-35 Rockaway Boulevard, Queens2 summonses · $X,XXX due
- 35-18 Garage Leavitt Street, Queens1 summons · $X,XXX due
- 35-20 Leavitt Street, Queens6 summonses
- 234 Mott Street, Manhattan2 summonses
- 63-86 Wetherole Street, Queens17 summonses
Upcoming hearings
- Aug 11, 2026summons 039554953RFail to notify DOB of accident incident damage to adjoining property
- Aug 11, 2026summons 039554952PMiscellaneous violations
- Aug 18, 2026summons 039555296KUnlawfully continued work while on notice of a stop work order
- Aug 18, 2026summons 039555298YFailure to maintain display on site documents required by bc CHAPTER33
- Aug 18, 2026summons 039555297MWork does not conform to approved construction documents amendments
Missing a hearing means the maximum penalty by default — and the clock to undo it runs 75 days.