NYC hearing docket
High Quality Construction
Respondent of record · docketed under 2 spellings
The city writes this respondent as High Quality Construction · High Quality Construction LLC — all folded into this one docket.
What drives the score
- +30
Defaulted hearings, unpaid — 17
Each default parks the maximum judgment on the owner's property record until it's vacated or paid.
- +25
Outstanding penalties
Unpaid balances accrue interest — and $25,000+ outstanding can freeze new DOB permits on the lots this company works.
- +8
Corrections never certified — 4
A summons without an accepted certificate of correction blocks the owner's DOB sign-offs and Certificate of Occupancy.
- +15
Job sites carrying open money — 31
Every site with an open balance is another owner in the blast radius.
- +10
Summonses in the last 12 months — 61
A live docket means the pattern is current, not history.
Scored 0–100 from the docket itself — defaults left on owners' property records, unpaid balances against the DOB's $25,000 permit-block line, corrections never certified, how many sites carry open money, and whether the docket is still live. The facts are the city's; the weighting is ours and shown above.
2 defaults are still inside the 75-day reopen window — a new hearing can be requested before the judgment hardens.
Job sites on the docket
- 2378 82 Street, Brooklyn8 summonses · $XX,XXX due
- 163-62 21 Road, Queens2 summonses · $XX,XXX due
- 10 St Marks Place, Manhattan10 summonses · $XX,XXX due
- 1143 Belt Parkway, Brooklyn5 summonses · $XX,XXX due
- 1852 East 12 Street, Brooklyn5 summonses · $XX,XXX due
- 261A 19 Street, Brooklyn2 summonses · $XX,XXX due
- 643 54 Street, Brooklyn5 summonses · $XX,XXX due
- 129 West 29 Street, Manhattan3 summonses · $XX,XXX due
+ 171 more sites
Upcoming hearings
- Jul 23, 2026summons 039165447PWork does not conform to approved const. Documents and or approved ame
- Aug 11, 2026summons 039166155HFailure to institute maintain safety equipment measures - no handrails
- Aug 11, 2026summons 039166177ZWork does not conform to approved construction documents amendments
- Aug 21, 2026summons 039166740ZWork does not conform to approved construction documents amendments
- Aug 24, 2026summons 039166163HWork without a permit
Missing a hearing means the maximum penalty by default — and the clock to undo it runs 75 days.