NYC hearing docket
Garden Of Eden Associates L P
Respondent of record · docketed under 9 spellings
The city writes this respondent as Garden Of Eden Associates L P · Garden Of Eden Associates, L.P · Garden Of Eden Associates · Garden Of Eden Associates, LP · Garden Of-Eden-Associates LP · Garden Of Eden Associates LP · Garden Of Eden Associates,LP · Garden Of Eden Associates L.P. · Garden Of Eden Associates,L.P. — all folded into this one docket.
What drives the score
- +27
Defaulted hearings, unpaid — 9
Each default parks the maximum judgment on the owner's property record until it's vacated or paid.
- +25
Outstanding penalties
Unpaid balances accrue interest — and $25,000+ outstanding can freeze new DOB permits on the lots this company works.
- +18
Corrections never certified — 9
A summons without an accepted certificate of correction blocks the owner's DOB sign-offs and Certificate of Occupancy.
- +9
Job sites carrying open money — 3
Every site with an open balance is another owner in the blast radius.
- +5
Summonses in the last 12 months — 5
A live docket means the pattern is current, not history.
Scored 0–100 from the docket itself — defaults left on owners' property records, unpaid balances against the DOB's $25,000 permit-block line, corrections never certified, how many sites carry open money, and whether the docket is still live. The facts are the city's; the weighting is ours and shown above.
Job sites on the docket
- 2217 8 Avenue, Manhattan22 summonses · $XX,XXX due
- 2211 8 Avenue, Manhattan17 summonses · $XX,XXX due
- 2215 8 Avenue, Manhattan1 summons · $X,XXX due
- 2211-15 7 Avenue, Manhattan1 summons
- 2211-15 8 Avenue, Manhattan1 summons
- 304 West 120 Street, Manhattan1 summons
- 360 West 117 Street, Manhattan11 summonses
Upcoming hearings
- Jul 30, 2026summons 039183804NFailure to maintain elevator or conveying system
- Jul 30, 2026summons 039174814MFailure to maintain elevator or conveying system
- Aug 13, 2026summons 039191081ZFailure to maintain elevator or conveying system
- Aug 31, 2026summons 039108238HFailure to maintain elevator or conveying system
Missing a hearing means the maximum penalty by default — and the clock to undo it runs 75 days.