NYC hearing docket

Cedar Manor Mut Hous

Respondent of record · docketed under 2 spellings

The city writes this respondent as Cedar Manor Mut Hous · Cedar Manor Mut Hous. — all folded into this one docket.

SEVERE riskOver the DOB $25K permit-block threshold
Contractor reputation score94
CleanSevere

What drives the score

  • +30

    Defaulted hearings, unpaid — 21

    Each default parks the maximum judgment on the owner's property record until it's vacated or paid.

  • +25

    Outstanding penalties

    Unpaid balances accrue interest — and $25,000+ outstanding can freeze new DOB permits on the lots this company works.

  • +20

    Corrections never certified — 20

    A summons without an accepted certificate of correction blocks the owner's DOB sign-offs and Certificate of Occupancy.

  • +15

    Job sites carrying open money — 6

    Every site with an open balance is another owner in the blast radius.

  • +4

    Summonses in the last 12 months — 4

    A live docket means the pattern is current, not history.

Scored 0–100 from the docket itself — defaults left on owners' property records, unpaid balances against the DOB's $25,000 permit-block line, corrections never certified, how many sites carry open money, and whether the docket is still live. The facts are the city's; the weighting is ours and shown above.

40
summonses on record
$XXX,XXX
outstanding balance
21
unpaid defaults
Aug 11, 2026
next hearing

Job sites on the docket

  • 116-45 157 Street, Queens9 summonses · $XX,XXX due
  • 116-01 157 Street, Queens11 summonses · $XX,XXX due
  • 116-25 157 Street, Queens7 summonses · $XX,XXX due
  • 116-31 157 Street, Queens6 summonses · $XX,XXX due
  • 116-51 157 Street, Queens5 summonses · $X,XXX due
  • 116-11 157 Street, Queens2 summonses · $X,XXX due

Upcoming hearings

  • Aug 11, 2026summons 039555097HTemporary construction equipment installation on site expired permit
  • Aug 11, 2026summons 039555093KTemporary construction equipment installation on site expired permit
  • Dec 11, 2026summons 039181166ZTemp construction equip installation on site expired permit shed
  • Jan 19, 2027summons 035693737RTemp construction equip installation on site expired permit shed
  • Mar 30, 2027summons 039181171NTemp construction equip installation on site expired permit shed

Missing a hearing means the maximum penalty by default — and the clock to undo it runs 75 days.

Is this your company's docket?

DailyDog watches it daily — every hearing across every site, the default and reopen clocks, your balance against the DOB's permit-block threshold, and the OATH paperwork prefilled. Company watches are set up by our team and priced for your caseload.