NYC hearing docket
Build Tech Construction C
Respondent of record · docketed under 6 spellings
The city writes this respondent as Build Tech Construction C · Build Tech Construction · Build Tech Construction C. · Build Tech Construction INC · Build Tech Construction CORP · Build Tech Construction Co — all folded into this one docket.
What drives the score
- +12
Defaulted hearings, unpaid — 4
Each default parks the maximum judgment on the owner's property record until it's vacated or paid.
- +25
Outstanding penalties
Unpaid balances accrue interest — and $25,000+ outstanding can freeze new DOB permits on the lots this company works.
- +15
Job sites carrying open money — 10
Every site with an open balance is another owner in the blast radius.
- +3
Summonses in the last 12 months — 3
A live docket means the pattern is current, not history.
Scored 0–100 from the docket itself — defaults left on owners' property records, unpaid balances against the DOB's $25,000 permit-block line, corrections never certified, how many sites carry open money, and whether the docket is still live. The facts are the city's; the weighting is ours and shown above.
Job sites on the docket
- 744 East 175 Street, Bronx17 summonses · $XX,XXX due
- 3612 Bronx Boulevard, Bronx3 summonses · $X,XXX due
- 864 East 164 Street, Bronx2 summonses · $X,XXX due
- 1155 Ellsworth Avenue, Bronx4 summonses · $X,XXX due
- 2960 Marion Avenue, Bronx2 summonses · $X,XXX due
- 2958 Marion Avenue, Bronx5 summonses · $X,XXX due
- 244 East 198 Street, Bronx7 summonses · $X,XXX due
- 744 East 175 Street, Bronx2 summonses · $X,XXX due
+ 22 more sites
Upcoming hearings
- Aug 14, 2026summons 039544173RFail to safeguard public and property
- Sep 18, 2026summons 039556193MTemporary construction equipment installation on site expired permit
- Sep 18, 2026summons 039556194YJob site fence not constructed or maintained pursuant to section
- Oct 16, 2026summons 039528285LWork without a permit
- Oct 16, 2026summons 039528286NWork without a permit
Missing a hearing means the maximum penalty by default — and the clock to undo it runs 75 days.