The Chrysler Building
405 Lexington Avenue, Manhattan · BBL 1012970023 · BIN 1036156
An Art Deco icon pushing 100 years old. Age shows up in the record: elevator devices, facade filings, and a long tail of open jobs that follow any building of this vintage.
Live report · as of Jul 10, 2026 · refreshed daily
What drives the score
Jobs without a final sign-off or Letter of Completion surface in every title search, lender review, and TCO/CO application.
Long-dormant open jobs usually require re-filing or an LS-1 withdrawal before the DOB will close them.
Work performed after permit expiration cannot be inspected or signed off until the permit is renewed.
Active DOB violations must be corrected and dismissed before a Certificate of Occupancy or Letter of Completion is issued.
Failure-to-file and safety-equipment violations must be resolved with the issuing unit before sign-offs, and several carry compounding civil penalties.
The heaviest open items
The 10 most consequential open records, straight from the city systems. Expand any card for the cure path.
REMOVAL AND INSTALLATION OF UNITS, DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING ON BASEMENT AND 1ST FLOOR RETAIL SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
- Work description
- REMOVAL AND INSTALLATION OF UNITS, DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING ON BASEMENT AND 1ST FLOOR RETAIL SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
- Filing status
- Approved
- Work location
- Basement/Sub-basement, Floor Number(s) 1 through 1
- Filed
- Jan 30, 2026
- Status date
- Feb 2, 2026
- Applicant
- Michael Gerazounis (PE)
- Filing representative
- Frank Fortino — Metropolis Group Inc
- Initial cost
- $80,000
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipFTC-VT-CAT1-CO (Elevators)
- Violation number
- VIO-FTC-VT-CAT1-202412-0008123
- Type code
- FTC-VT-CAT1-CO
- Status
- Active
- Issued
- Oct 10, 2025
- Device type
- Elevators
FTC-VT-CAT1-CO (Elevators)
- Violation number
- VIO-FTC-VT-CAT1-202412-0010105
- Type code
- FTC-VT-CAT1-CO
- Status
- Active
- Issued
- Oct 10, 2025
- Device type
- Elevators
INSTALLING SPRINKLER HEADS AND PIPING OF 23RD FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
- Work description
- INSTALLING SPRINKLER HEADS AND PIPING OF 23RD FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
- Filing status
- Approved
- Work location
- Floor Number(s) 23 through 23
- Filed
- Jul 2, 2025
- Status date
- Jul 3, 2025
- Applicant
- Michael Gerazounis (PE)
- Filing representative
- Frank Fortino — Metropolis Group Inc
- Initial cost
- $110,000
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipMODIFICATION TO HVAC EQUIPMENT IN 57TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
- Work description
- MODIFICATION TO HVAC EQUIPMENT IN 57TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
- Filing status
- Approved
- Work location
- Floor Number(s) 57 through 57
- Filed
- Feb 26, 2025
- Status date
- Feb 26, 2025
- Applicant
- Michael Gerazounis (PE)
- Filing representative
- Frank Fortino — Metropolis Group Inc
- Initial cost
- $20,454
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipMODIFICATION TO HVAC EQUIPMENT 23RD FLOOR OFFICE. NO CHANGE TO USE , EGRESS OR OCCUPANCY
- Work description
- MODIFICATION TO HVAC EQUIPMENT 23RD FLOOR OFFICE. NO CHANGE TO USE , EGRESS OR OCCUPANCY
- Filing status
- Approved
- Work location
- Floor Number(s) 23 through 23
- Filed
- Nov 20, 2024
- Status date
- Nov 21, 2024
- Applicant
- Michael Gerazounis (PE)
- Filing representative
- Frank Fortino — Metropolis Group Inc
- Initial cost
- $580,000
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipINSTALLING SPRINKLER HEADS AND PIPING OF 23RD FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
- Work description
- INSTALLING SPRINKLER HEADS AND PIPING OF 23RD FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
- Filing status
- Approved
- Work location
- Floor Number(s) 23 through 23
- Filed
- Sep 10, 2024
- Status date
- Sep 13, 2024
- Applicant
- Michael Gerazounis (PE)
- Filing representative
- Frank Fortino — Metropolis Group Inc
- Initial cost
- $110,000
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipPlumbing and Sprinkler work related to store renovation as per plans filed.
- Work description
- Plumbing and Sprinkler work related to store renovation as per plans filed.
- Filing status
- Permit Entire
- Work location
- Basement/Sub-basement, Floor Number(s) 001 through 001
- Filed
- Mar 25, 2021
- First permit
- Jan 20, 2022
- Status date
- Aug 21, 2023
- Applicant
- Andrew Bennett (PE)
- Filing representative
- Vito Gerbino — Km Associates Of New York
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipREMOVE, RELOCATE AND INSTALL SPRINKLER HEADS AND RELATED PIPING IN OFFICE SPACE ON 44TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
- Work description
- REMOVE, RELOCATE AND INSTALL SPRINKLER HEADS AND RELATED PIPING IN OFFICE SPACE ON 44TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
- Filing status
- Approved
- Work location
- Floor Number(s) 44 through 44
- Filed
- May 12, 2023
- Status date
- May 15, 2023
- Applicant
- Michael Gerazounis (PE)
- Filing representative
- Karolina Castro — Metropolis Group Inc
- Initial cost
- $15,000
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipModification to the existing sprinkler system.
- Work description
- Modification to the existing sprinkler system.
- Filing status
- Permit Entire
- Work location
- Floor Number(s) 1 through 1, Floor Number(s) 37 through 37, Floor Number(s) 49 through 49, Floor Num
- Filed
- Sep 12, 2019
- First permit
- Oct 10, 2019
- Status date
- Mar 8, 2023
- Applicant
- Calogero Patti (PE)
- Filing representative
- Thomas Jacobsen — Metropolis Group Inc.
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membership+ 377 more open records in the full sweep
This report exists for every building in NYC
Run the same sweep on yours — free, no signup.