The Chrysler Building
405 Lexington Avenue, Manhattan · BBL 1012970023 · BIN 1036156
An Art Deco icon pushing 100 years old. Age shows up in the record: elevator devices, facade filings, and a long tail of open jobs that follow any building of this vintage.
Live report · as of Nov 28, 2026 · refreshed daily
What drives the score
Jobs without a final sign-off or Letter of Completion surface in every title search, lender review, and TCO/CO application.
Long-dormant open jobs usually require re-filing or an LS-1 withdrawal before the DOB will close them.
Work performed after permit expiration cannot be inspected or signed off until the permit is renewed.
Active DOB violations must be corrected and dismissed before a Certificate of Occupancy or Letter of Completion is issued.
Failure-to-file and safety-equipment violations must be resolved with the issuing unit before sign-offs, and several carry compounding civil penalties.
The heaviest open items
The 10 most consequential open records, straight from the city systems. Expand any card for the cure path.
REPAIR OF EXTERIOR WALLS AND APPURTENANCES INCLUDING: MORTAR JOINT REPOINTING, LOCALIZED BRICK REPLACEMENT, LINTEL WATERPROOFING AND STEEL REPAIRS, STONE REPAIRS, WINDOW AND SEALANT REPAIRS, AND SHEET METAL AND FLASHING WORK AS PER PLANS FILED HEREWITH.
- Work description
- REPAIR OF EXTERIOR WALLS AND APPURTENANCES INCLUDING: MORTAR JOINT REPOINTING, LOCALIZED BRICK REPLACEMENT, LINTEL WATERPROOFING AND STEEL REPAIRS, STONE REPAIRS, WINDOW AND SEALANT REPAIRS, AND SHEET METAL AND FLASHING WORK AS PER PLANS FILED HEREWITH.
- Filing status
- Approved
- Work location
- Facade, Facade
- Filed
- Nov 23, 2026
- Status date
- Nov 25, 2026
- Applicant
- Anita Asokan (RA)
- Filing representative
- Rudy Rodriguez — Milrose Consultants Llc
- Initial cost
- $4,293,600
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership. First month free right now.
INTERIOR DEMOLITION OF EXISTING OFFICE SPACE ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Work description
- INTERIOR DEMOLITION OF EXISTING OFFICE SPACE ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Filing status
- QA Failed
- Work location
- Floor Number(s) 43 through 43, Floor Number(s) 37 through 37, Floor Number(s) 28 through 28
- Filed
- Nov 24, 2026
- Status date
- Nov 25, 2026
- Applicant
- Thomas Lanzelotti (RA)
- Filing representative
- Robyn Wong — Gillman Consulting Inc
- Initial cost
- $211,800
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership. First month free right now.
INTERIOR DEMOLITION OF EXISTING OFFICE SPACE ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Work description
- INTERIOR DEMOLITION OF EXISTING OFFICE SPACE ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Filing status
- Approved
- Work location
- Floor Number(s) 28 through 28, Floor Number(s) 37 through 37, Floor Number(s) 43 through 43
- Filed
- Oct 28, 2026
- Status date
- Nov 23, 2026
- Applicant
- Thomas Lanzelotti (RA)
- Filing representative
- Robyn Wong — Gillman Consulting Inc
- Initial cost
- $211,800
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership. First month free right now.
INTERIOR DEMOLITION OF EXISTING OFFICE SPACE ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Work description
- INTERIOR DEMOLITION OF EXISTING OFFICE SPACE ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Filing status
- Approved
- Work location
- Floor Number(s) 28 through 28, Floor Number(s) 37 through 37, Floor Number(s) 43 through 43
- Filed
- Nov 19, 2026
- Status date
- Nov 23, 2026
- Applicant
- Thomas Lanzelotti (RA)
- Filing representative
- Robyn Wong — Gillman Consulting Inc
- Initial cost
- $211,800
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership. First month free right now.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
- Work description
- INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
- Filing status
- Permit Entire
- Work location
- Open Space
- Filed
- Nov 9, 2026
- First permit
- Nov 16, 2026
- Status date
- Nov 16, 2026
- Applicant
- Md Tohfaz Uddin (PE)
- Filing representative
- Ansar Khan — The Green Studio
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership. First month free right now.
Installation of suspended scaffold for facade work or inspection.
- Work description
- Installation of suspended scaffold for facade work or inspection.
- Filing status
- Approved
- Filed
- Nov 4, 2026
- Status date
- Nov 16, 2026
- Applicant
- Kunal Bakhtarwala (PE)
- Filing representative
- Ely Sepulveda — Ae Design Solution Inc.
- Initial cost
- $0
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership. First month free right now.
MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Work description
- MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Filing status
- Approved
- Work location
- Floor Number(s) 28 through 28, Floor Number(s) 37 through 37, Floor Number(s) 43 through 43
- Filed
- Oct 28, 2026
- Status date
- Nov 9, 2026
- Applicant
- John Anthes (PE)
- Filing representative
- Robyn Wong — Gillman Consulting Inc
- Initial cost
- $24,822
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership. First month free right now.
MODIFICATION TO EXISTING PLUMBING SYSTEM AS PER PLANS ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Work description
- MODIFICATION TO EXISTING PLUMBING SYSTEM AS PER PLANS ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Filing status
- Approved
- Work location
- Floor Number(s) 28 through 28, Floor Number(s) 37 through 37, Floor Number(s) 43 through 43
- Filed
- Oct 28, 2026
- Status date
- Oct 30, 2026
- Applicant
- John Anthes (PE)
- Filing representative
- Robyn Wong — Gillman Consulting Inc
- Initial cost
- $11,946
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership. First month free right now.
MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Work description
- MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS ON FLOORS 28, 37 AND 43. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Filing status
- Approved
- Work location
- Floor Number(s) 28 through 28, Floor Number(s) 37 through 37, Floor Number(s) 43 through 43
- Filed
- Oct 28, 2026
- Status date
- Oct 30, 2026
- Applicant
- John Anthes (PE)
- Filing representative
- Robyn Wong — Gillman Consulting Inc
- Initial cost
- $36,480
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership. First month free right now.
MODIFICATION TO EXISTING PLUMBING SYSTEM AS PER PLANS ON FLOORS 36 AND 38. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Work description
- MODIFICATION TO EXISTING PLUMBING SYSTEM AS PER PLANS ON FLOORS 36 AND 38. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Filing status
- Permit Entire
- Work location
- Floor Number(s) 36 through 36, Floor Number(s) 38 through 38
- Filed
- Oct 26, 2026
- First permit
- Oct 29, 2026
- Status date
- Oct 29, 2026
- Applicant
- John Anthes (PE)
- Filing representative
- Robyn Wong — Gillman Consulting Inc
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership. First month free right now.
+ 400 more open records in the full sweep
This report exists for every building in NYC
Run the same sweep on yours — free, no signup.